============================================ PSIO Switch Board Installation Guide PU-8, Revision 1.5. -------------------------------------------- What Was Last Changed? - Revision 1.5 - Changed the Switch Board placement image. - Revision 1.4 - Updated Page 8's text information since it was incorrect. Also Added an additional ground solder point location. - Revision 1.3 - Updated two images for clearer installation. - Revision 1.2 - Fixed a mistake with an incorrect image being used on page 8. - Revision 1.1 - Changed the Parallel Port image and fixed a mistake with the CPU lines. - Revision 1.0 - First Release ============================================